- Finishing the installation of the new/old A/C which included reinstalling the condensate drain pump inside the roof-top unit, and fastening the remaining bolts inside securing the drop-down decorative ceiling plate which conceals the A/C cooling vents and access to the ducts.
- Removing the bedroom window treatment and restringing the day/night shade.
- Realignment of the patio awning arms and canvas, and securing some parts that had worked loose
- Replacing a turn signal control inside the steering column. This item was originally scheduled for tomorrow but parts arrived yesterday so they completed their work list today!
Anyway - Our repair list is finally complete!! The only thing left is to pay the bill, but most of that is either covered as repairs covered by the dealer as part of the sale, or covered by our extended warranty.
We'll stay here until Sunday when we'll start our journey toward Wisconsin. Since our route takes us through Louisville, we'll spend a few days there visiting with family and friends. It will be wonderful to get these big wheels turning again.
No comments:
Post a Comment